Tuesday, October 8, 2013

Putting in the Septic Tanks and Field




 One of the really big jobs to get done prior to building the house is the septic field. I would really have preferred not to have had to put one in. I believe that on an island that sets a priority of conserving water that it is time to seriously consider alternatives to demanding the use of septic fields as the only means of sewage treatment. It seems a shame to use so much water in order to flush the sewage into a septic tank and field.  There is now well documented evidence of communities that use advanced composting toilet systems and these communities manage to protect their water shed as a result.  It would be nice to hope that in the future such alternatives will be available to home builders on Mayne Island.

In order to put in a septic field on Mayne Island, you have to have a design engineered and approved by the Islands Trust/Health Authority. Andrew Money designed and got permission from the powers that be for my septic field and tanks to be installed.  He lives on Saturna Island and works with Matt Taylor of Mayne Island. Matt has all the heavy equipment you see in these pictures.  He was unable to put my septic in himself due to a broken wrist that needed time to heal properly.

Luckily Andrew was available to do the work and I so appreciate the job he did for me.  It is great when island folk pull together to help get the job done in this way. Andrew was excellent and I am so happy with the work done.
Andrew Money

Matt Taylor


Starting the excavation.


Ready for the pipes to be laid.


The actual septic field extends below the site where the house will sit. My lot is on a slope so we stepped down for the septic field.  It is set on a terrace that will be accessible by stairs from the patio.


Here you can see the drop off from the building site.

Lots of care taken to smooth off the field.

Lots of sand in the septic field with upright pipes.




The tanks were first placed up on the top of the site while the excavation was completed.




Tank waiting to be installed.

 There were two tanks with three chambers. These had to be buried in the ground below where the house is being constructed.


Front view of the tank.

The side view of the double tank.
In position and being filled in.
Nearly done.




Andrew was so skilled at filling in around the tanks with the back hoe.





So now I have my tanks and septic field installed I can heave a huge sigh as it was one of the major steps towards beginning the actual building of the cob house.  A very important part of the infra-structure.

Friday, September 13, 2013

The Footings are In

It has been a fantastic summer weather wise and we got quite a lot done.
I was blessed to have Peter Wilkening recommended to me as a great person to do the footings.  When he came over for our first meeting he suggested filling in the trenches we had dug down into the site and to build up instead. This was perfect as the site is on a hill and this means there will be less of a drop off to the house.  With the plans to terrace back up the hill, this is a really amazing solution for me. I also really appreciated that he called in the building inspector to check the site was sound and that there would be no problems down the road regarding the footings. :-)

After we got the OK, he started building the frames.


  Peter came up with all kinds of creative solutions as to how to deal with the curved walls etc. By building big rectangular footings we have the base needed to build the dry stack foundation on, free forming the curves.  It will work out perfectly. The engineer concurred.
 The interior supporting walls needed a taller frame.





After building the wooden forms he put in all the rebar and called for the inspection. It was passed and the engineer inspected the photos of the work done and signed off on it.

Last Monday the concrete was poured.






This is a big step towards building. It is all I am doing this year, as I have my thesis to write by October/November and then I am off on my travels for six months.

Next summer we will build the rock foundation on top of the footings, and fill in the middle so we can lay the radiant floor heating hose and the natural floor when the time comes. Some of the rock is already on site and whatever else we need I will source next summer.

I am so grateful to be at this stage of the building. I could not have done it without the expertise of Peter and Gary and the help of Matt Taylor and Andrew Money with their JCB/backhoe.  I must find out what they call it in Canada lol.